Skip to content

Last Mile · Supply Chain

Only 12.1% of Firms Hit Logistics Tech Goals

A May 2026 survey of over 200 logistics professionals by JBF Consulting reveals only 12.1% of organizations achieved all three goals—on-time, on-budget, and outcome-delivery—for logistics technology implementations. Budget overruns (11–25%) affected 62% of respondents; 82% took over six months for full adoption; only 10% appointed a single empowered program lead; and just 8.2% offered role-specific training. JBF attributes the gap to conflating systems integration with business integration.

Original source: thescxchange.com

Only 12.1% of Firms Hit Logistics Tech Goals
📋 本文要点

A May 2026 survey of over 200 logistics professionals by JBF Consulting reveals only 12.1% of organizations achieved all three goals—on-time, on-budget, and outcome-delivery—for logistics technology implementations. Budget overruns (11–25%) affected 62% of respondents; 82% took over six months for full adoption; only 10% appointed a single empowered program lead; and just 8.2% offered role-specific training. JBF attributes the gap to conflating systems integration with business integration.

According to www.thescxchange.com, a survey of more than 200 supply chain and logistics professionals conducted by Connecticut-based JBF Consulting in May 2026 found that only 12.1% of organizations delivered logistics technology implementations on time, on budget, and achieving their expected outcomes.

Implementation Integrity Gap Revealed

The shortfall stems from a fundamental misalignment between technical deployment and operational adoption. As outlined in JBF Consulting’s whitepaper titled “Business Integration vs. Systems Integration: The Distinction That Separates Implementations That Deliver Business Value From Those That Just Go-Live,” the firm identifies a critical gap — the “Implementation Integrity Gap.” This gap reflects the difference between installing software (“systems integration”) and embedding it into daily operations through process redesign, governance, training, and change management (“business integration”).

According to the report, only 7.7% to 12.1% of organizations reported executing any single discipline of business integration well — such as cross-functional workflow alignment or performance governance. Brad Forester, Founder and CEO of JBF Consulting, framed the distinction vividly:

“Systems integration installs the ovens. Business integration teaches people how to run the restaurant.” — Brad Forester, Founder and CEO of JBF Consulting

He emphasized that the real cost of implementation is not the technology itself but the organizational capabilities left undeveloped around it.

Cost, Timeline, and Leadership Shortfalls

Budget overruns were widespread: 62% of respondents reported cost overruns in the 11–25% range. Meanwhile, full operational adoption took longer than anticipated — more than 82% of organizations required over six months to reach that stage. Leadership accountability was also weak: only 10% of organizations designated a single program lead with real decision-making authority — a structural deficiency cited by 44.4% of respondents as the leading reason they engaged external advisory support.

Training Deficits Undermine Adoption

Training practices proved especially inadequate. Just 8.2% of organizations provided role-specific, workflow-tailored training — a critical failure point given that end-user proficiency directly determines system utilization and ROI. The source states that this lack of contextualized learning contributes significantly to low user engagement and post-go-live attrition of functionality.

The survey underscores a broader industry pattern: technology investments are frequently treated as discrete IT projects rather than enterprise-wide capability transformations. Practitioners note that without parallel investment in organizational design — including updated KPIs, revised escalation paths, and embedded feedback loops — even best-in-class tools remain underutilized. For supply chain professionals managing digital upgrades, the implication is clear: success hinges less on vendor selection and more on internal readiness architecture — measured in trained personnel, empowered leads, and documented process handoffs, not just go-live dates.

Source: thescxchange.com

Compiled from international media by the SCI.AI editorial team.

Ask SCI.AI Finished reading? Continue with SCI.AI. Explore the related policy, route, company and historical context. Continue asking
NRF: Early peak shipping season to subside in September
Supply Chain

NRF: Early peak shipping season to subside in September

The National Retail Federation (NRF) and Hackett Associates report that the early peak shipping season is ending, with U.S. port imports expected to decline for the rest of 2026. May was the busiest month at 2.24 million TEU. Tariff changes and supply chain disruptions drove retailers to pull forward orders. Consumer spending remains resilient. Full-year 2026 imports are projected at 25.5 million TEU, up 0.1% from 2025.

China’s exports rise 14%, imports up 22% amid trade war resilience
Supply Chain

China’s exports rise 14%, imports up 22% amid trade war resilience

China’s foreign trade rose 17.3% to ¥30.13 trillion in the first seven months of 2026, with exports up 14% and imports surging 22%. High-tech exports jumped over 50% in July, accounting for nearly 60% of monthly export growth. U.S.-China trade fell 1.6%, while ties with over 180 countries—including ASEAN and the EU—expanded. Green exports like EVs and lithium batteries posted double-digit growth for the 17th straight month. China also applies zero tariffs to imports from 63 countries.

TSMC revenue up 33.7%, ASML ships 86 lithography machines
Manufacturing

TSMC revenue up 33.7%, ASML ships 86 lithography machines

TSMC reported $40.2 billion in Q2 2026 revenue — up 33.7% year-on-year — with 2-nm process contributing 3% of sales. ASML shipped 86 new lithography machines in the same quarter, boosting revenue to €9.32 billion ($10.69 billion). TSMC holds 73% of the global foundry market, while ASML’s EUV tools remain essential for sub-3-nm chip production. Both companies’ five-year net income grew over 90% (ASML) and 251% (TSMC). TSMC’s $100 billion Arizona expansion will support 2-nm manufacturing and advanced packaging.

Welcome Back!

Login to your account below

Create New Account!

Fill the forms below to register

Retrieve your password

Please enter your username or email address to reset your password.

Scan to share via WeChat

Open WeChat and scan the QR code to share

QR Code

Add New Playlist